Bearing Capacity Check Northland
Council asked for a "site suitability report on soil bearing conditions"? We test the ground under your new house or extension and confirm whether it is good ground under NZS 3604. You get a short signed memo for your building consent, usually from a single site visit.
Why Council Asks for a Bearing Check
Standard house foundations under NZS 3604 only work on "good ground". Good ground has an ultimate bearing capacity of at least 300 kPa and is not soft, filled, expansive or unstable.
If your plans use NZS 3604 footings or slabs, council needs evidence that the ground qualifies. Without it, they send an RFI citing NZS 3604 clause 3.2.2 and hold your consent. A bearing capacity check answers that RFI. If the ground falls short, the check tells your designer what the foundations need instead.
Common reasons for the RFI
The new footings sit on ground nobody has tested, even if the original house was fine.
Any new building on NZS 3604 foundations needs good ground confirmed.
Fill, cut slopes and old slips raise council's concern. These may need a slope stability assessment as well.
Many Northland clays are strong but some swell and shrink. Council wants to know which kind you have.
What the Check Involves
- Desktop review. We check the geology maps, soil maps and council records for the site.
- Hand auger boreholes. We drill inside the building footprint to at least 2 m, or until the auger can go no deeper.
- Shear vane tests. We test the soil strength every 0.3 m down each hole, following the NZGS shear vane guideline.
- Soil logging. We describe each layer to the NZGS field guide and note any groundwater.
- Expansive soil assessment. We judge how much the clay will swell and shrink, which sets the site reactivity class.
What the memo gives your designer
| Ultimate bearing capacity | The load the ground can carry, in kPa. 300 kPa or more meets NZS 3604. |
|---|---|
| Good ground | Yes or no, under NZS 3604 |
| Site soil class | NZS 1170.5 class for seismic design |
| Reactivity class | AS 2870 class for expansive soils |
| Liquefaction | Whether the soils could liquefy in an earthquake |
| Bore logs | Soil layers and shear vane results for each hole |
Example: House Extension, Kerikeri
FNDC put a two-bedroom extension in Kerikeri on hold with an RFI asking for a site suitability report on soil bearing. The site sits on Kerikeri volcanic basalt, which weathers into deep red-brown clay.
We drilled two boreholes in the extension footprint, to 2.1 m and 2.5 m, and ran 14 shear vane tests. Both holes found very stiff silty clay from 0.2 m down, with no groundwater. The clay was mainly illite, which does not swell when wet.
| Result | Finding |
|---|---|
| Ultimate bearing capacity | 300 kPa minimum |
| Good ground under NZS 3604 | Yes |
| Site soil class (NZS 1170.5) | Class C |
| Reactivity class (AS 2870) | S (slightly reactive) |
| Liquefaction | No |
The extension could go ahead on a standard NZS 3604 slab, and the memo answered that RFI item. The same RFI asked whether the existing septic could take two more bedrooms, and we answered that with a septic feasibility check.
Bearing Capacity Questions
Is a bearing check the same as a geotechnical report?
It is a smaller version focused on one question, whether the ground can carry standard foundations. Steep, filled or unstable sites need a full geotechnical report instead.
What happens if my site is not good ground?
The memo sets out what the ground can carry, and your foundations get specific engineering design. Typical fixes are deeper piles, wider footings or a raft slab. See foundation design.
Do you need to dig up my lawn?
No. A hand auger hole is about 50 mm across. We backfill the holes when we finish.
How fast can you answer an RFI?
Send us the RFI letter, your plans and the property address. Most checks need one site visit and a short memo.
How much does it cost?
Every project is different, so we quote each one. Send us your details and we'll give you a free, no-obligation quote.
Which councils accept your memos?
We work with Far North, Whangarei and Kaipara District Councils.